Photograph one shows a before picture of the existing roofing materials which were completely removed to allow for new roof GRP fiberglass works to be carried out.

Photograph one shows fully boarded scaffolding surrounding the property to allow for all roof works to be carried out safely.

Photograph one shows the existing gutter liner felt system which was found to be of poor quality felt which was causing water ingress into the property

Photograph one shows the existing gutter liner felt system which was found to be of poor quality felt which was causing water ingress into the property

Photograph two shows front elevation scaffolding erected to allow a safe platform for a full renewal of the entire roof.

Photograph one shows a before photograph of an asphalt roof which was showing signs of wear and tear.

Photograph one shows the front elevation of the Fraser Suites hotel in Edinburgh, roof works were carried out to the entire building.

Photograph one shows a zinc detail which was believed to be the existing from when the property was built and found to be in need of renewal, the area was peppered with small holes and in poor condition, existing render was also found to be boss and cracked to low level area only.

Photograph one shows a before photo of the property where the client was experiencing water ingress in several areas, the roof slates, lead work and mortar skew haunching’s to the property were of a poor condition and required renewal.

We would take pictures of your gutters to let you see their condition. Because if guttering and rhones are not regularly cleaned out they can get clogged with moss and leaves and then they can over flow causing damp on your walls.

This photgraph illustrates rain water ponding behind the box gutter gully and also in the gutter, an insufficient run to out let was previously installed before single ply materials were laid.

Bay window detail. The customer was looking to do a roof renewal. The roof area was suffering from nail rot, where all lead flashings and cast Rhone’s were found to be in need of a complete renewal.

New beads are secured to all corners, bell casts and stop ends using IDP fixings, these provide a neat finish and stronger edge detail coated to a scratch finish and allowed to fully set.