Forrest Park Green

Project Detail

Forrest Park Green – Flat Roof replacement

Photograph one shows fully boarded scaffolding surrounding the property to allow for all roof works to be carried out safely.

2- forrest_park_green_flat_roof

spacer

Photograph two shows then men stripping all materials down to existing timber joists in preparation for new roofing materials.

3-stripping-down-of-flat-roof

spacer

Photograph three shows new 18mm OSB board installed with 3B base layer tacked to new timbers followed by 50mm insulation.
OSB Installation

spacer

Photograph four shows new 50mm insulation fully secured to new timber decking using galvanized fixings and washer plates, followed by a 2mm thick roofing felt heated down to new bitumouse insulation.
5-insulation-secured
Photograph five shows where all existing rotten timber facia’s were removed from perimeters and renewed with new white 16mm white Upvc facia’s with a clean 60mm aluminium trim edge detail.
6-rotten-fascias-removed

spacer

Photograph six shows where all existing rotten timber facia’s were removed from perimeters and renewed with new white 16mm white Upvc facia’s with a clean 60mm aluminium trim edge detail.

7-perimiters-replaced

spacer

Photograph seven shows a completely new traditional five layer finish from timber trusses to a high performance Esterflex Pollyglass SBS green mineral.
8-five-layer-finish

spacer

Photograph eight shows where all existing rotten timber facia’s were removed from perimeters and renewed with new white 16mm white Upvc facia’s with a clean 60mm aluminium trim edge detail.
9-aluminium-trim-and-fascias